NETR: what the energy plan means for Malaysian factories
Published · 6 min read · IoTronix Solution
In short
The National Energy Transition Roadmap (NETR) affects factories in two main ways. First, energy efficiency: a 22% savings target for commercial and industrial users by 2040, plus the duties under EECA 2024. Second, green power: rooftop solar, the Corporate Green Power Programme and TNB's Green Electricity Tariff. A factory should first measure its own energy use per line and per machine. Every one of these options is sized and checked against that starting figure.
What is NETR
The Ministry of Economy launched the first phase of the National Energy Transition Roadmap (NETR) on 27 July 2023 [2], and the full roadmap followed on 29 August 2023 [1]. NETR works through six levers: energy efficiency, renewable energy, hydrogen, bioenergy, green mobility and carbon capture, utilisation and storage (CCUS) [1].
The main targets are a renewable energy share of installed capacity of 40% by 2035 and 70% by 2050 [2]. NETR estimates the transition needs RM1.2 trillion to RM1.3 trillion of investment by 2050, and it rules out new coal-fired generation [1]. To start the funding, the government set up the National Energy Transition Facility with a seed fund of RM2 billion [1].
Most of this is work for the power sector. For a factory, four parts of NETR matter.
Energy efficiency: the part with targets for industry
NETR Phase 2 sets a national energy savings target of 21% on average by 2040. The target for the commercial and industrial sector is 22% [3]. It includes compulsory energy audits for larger commercial and industrial buildings [3]. The roadmap puts investment of up to RM6 billion into energy efficiency improvements by 2040 [3].
The energy audit rule became law under the Energy Efficiency and Conservation Act 2024 (EECA). In 2026, PETRA published NEEAP 2.0, which works together with EECA. It sets a target to reduce industrial energy demand by 11.9% by 2035, compared with business as usual [4]. NEEAP 2.0 names five groups of energy saving measures for industry: energy management systems, efficient facilities, production processes, electrical equipment and thermal equipment [4].
Solar and green power for companies
NETR depends on solar for most new renewable capacity [1]. A factory can take part in three ways.
| Route | How it works | Status |
|---|---|---|
| Corporate Green Power Programme (CGPP) | A corporate TNB customer contracts a solar plant for a virtual purchase of its output, while still taking electricity from TNB [5] | Quota of 800 MW, individual quotas of 7 MWac to 30 MWac, plants targeted to operate from 2025 [5] |
| Corporate Renewable Energy Supply Scheme (CRESS) | Corporate users buy electricity from a renewable energy generator of their choice through the grid [7] | Announced in Budget 2025 [7] |
| Green Electricity Tariff (GET) | Customer pays the normal tariff plus a premium for subscribed green units [6] | Premium from 3 sen/kWh on a three-year subscription, subject to quota [6] |
By August 2023, ST had allotted CGPP quotas to 22 bidders out of 71 applications [5]. Rooftop solar on the factory itself remains the most direct option. For any option, the size depends on how much power you use and at what time.
What changed in Budget 2027
Budget 2027 was tabled on 9 October 2026. It extended the green technology tax incentives to 31 December 2030, but covers fewer items [8]. For assets bought for own use, green building and energy efficiency items will no longer qualify for the Green Investment Tax Allowance (GITA) [8].
A new Tier 1 category covers renewable energy integrated systems, including solar, and battery or energy storage systems [8]. The Green Income Tax Exemption for solar leasing accepts applications only until 31 December 2026 [8].
Do you plan to claim GITA for an energy efficiency upgrade? Check the final Budget 2027 asset list with your tax adviser before you spend.
What energy data to measure first
- Total energy per site for 12 months, electricity and fuel, to see where you stand against EECA and the NETR savings targets [3] [4].
- Energy per line and per major machine, because you save energy one machine at a time.
- Load by hour of the day, which decides how much rooftop solar you can use on site.
- Idle and standby power: what machines draw when they are not making parts.
- Output per shift, so you can report energy per unit made instead of only kWh.
Measure your energy use per machine first
Energy meters and FactoryOS energy apps show your power use per machine and per job. Start with a free 30-minute Factory Paperwork Check: we come to your factory and show you the 3 processes that waste the most time.
Questions
What is the NETR energy efficiency target for industry?
NETR Phase 2 sets a 22% energy savings target for the commercial and industrial sector by 2040. The national average target is 21% [3]. NEEAP 2.0 adds an industrial demand reduction target of 11.9% by 2035 [4].
Can my factory still join CGPP?
CGPP had a fixed quota of 800 MW [5]. Budget 2025 announced CRESS, which lets companies buy renewable electricity from a generator they choose [7]. GET is still open, if quota is available [6].
Does Budget 2027 still give tax allowances for energy efficiency?
Not for most items. For assets bought for own use, green building and energy efficiency items will no longer qualify for GITA. Solar and energy storage systems are in a new Tier 1 category [8].
Sources
- [1]Argus Media. Malaysia unveils details of energy transition roadmap, 2023-08-29
- [2]Christopher & Lee Ong (via Legal 500). Malaysia's National Energy Transition Roadmap Part 1: Flagship Catalyst Projects and Initiatives, 2023-12-01
- [3]The Edge Malaysia. Malaysia to invest RM13b by 2040 to improve energy efficiency, 2023-08-29
- [4]Ministry of Energy Transition and Water Transformation (PETRA). National Energy Efficiency Policy and Action Plan 2026 to 2035 (NEEAP 2.0)
- [5]The Star. CGPP allocation still has a balance of about 30%, 2023-08-08
- [6]Tenaga Nasional Berhad. Green Electricity Tariff (GET)
- [7]MIDA. Budget 2025: Govt to introduce carbon tax on iron, steel and energy industries by 2026, 2024-10-18
- [8]EY Malaysia. Take 5 for business: Malaysia Budget 2027, 2026-10-09