Energy Cost per Machine: Which Machine Uses Most Power
Published · 7 min read · IoTronix Solution
In short
To find which machine uses the most of your TNB bill, put a power meter on each big machine and record its kW. Split its kWh into peak and off-peak hours. Then price it at your tariff's energy charge: 31.32 sen/kWh peak and 27.23 sen/kWh off-peak on the medium voltage ToU tariff [1]. Next, check which machines run in the half hour that sets your maximum demand. Each kW in that half hour costs RM97.06 a month in capacity and network charges [1] [3].
Why one TNB bill cannot show the cost of each machine
The TNB meter at your main intake measures the whole factory. It cannot tell you that the injection moulder in bay 3 costs more to run than the extrusion line beside it. It also cannot tell you that the air compressor ran all weekend with nobody in the factory.
Owners usually guess from nameplates, or from which machine feels hottest. Both guesses miss the two things the tariff charges for: how many kWh each machine uses, and when it uses them [1] [2]. This guide shows how to get both numbers for each machine and convert them into RM.
For what changed in July 2025, read our guide to the July 2025 electricity tariff for factories. Here we use the same tariff to work out the cost of each machine.
How the 2025 TNB tariff charges a factory
From 1 July 2025 to 31 December 2027, the Energy Commission's tariff splits a non-domestic bill into four charges: energy, capacity, network and a fixed monthly charge [1]. A fuel adjustment (AFA) is added on top. It changes every month and can be a rebate or a surcharge [2].
Your supply voltage decides which of these charges depend on time and demand. Check the tariff name printed on your bill.
| Tariff | Energy charge | Capacity charge | Network charge | Fixed charge |
|---|---|---|---|---|
| Non-Domestic Low Voltage General | 27.03 sen/kWh [1] | 8.83 sen/kWh [1] | 14.82 sen/kWh [1] | RM20 a month [1] |
| Non-Domestic Medium Voltage General | 29.83 sen/kWh [1] | RM29.43 per kW of maximum demand [1] | RM59.84 per kW of maximum demand [1] | RM200 a month [1] |
| Non-Domestic Medium Voltage ToU | 31.32 sen/kWh peak, 27.23 sen/kWh off-peak [1] | RM30.19 per kW of peak-period maximum demand [1] | RM66.87 per kW of peak-period maximum demand [1] | RM200 a month [1] |
On low voltage, every charge except the fixed one is per kWh, so a machine's cost is simply its kWh times 50.68 sen before AFA (27.03 plus 8.83 plus 14.82) [1]. On medium voltage, the per kWh rate covers energy only. Capacity and network follow your maximum demand, and on ToU only demand inside the peak window counts [1] [2].
ToU peak is 2 pm to 10 pm, Monday to Friday. Weekday hours from 10 pm to 2 pm, and all of Saturday and Sunday, are off-peak [2].
Maximum demand: one half hour sets a monthly charge
TNB takes the highest kWh supplied in any 30 minutes in a row during the month, and doubles it. That is your maximum demand [3]. In simple terms, it is your highest half-hour average kW.
One bad half hour sets the charge for the whole month. On medium voltage ToU, each kW of peak-period maximum demand costs RM30.19 for capacity plus RM66.87 for network, RM97.06 in total [1]. If three moulders, a chiller and the compressor all restart together at 2.30 pm after a power trip, that half hour can set the month's figure.
TNB's own advice is to move heavy operations to off-peak hours and to start motors and equipment in stages [3]. You can only plan that when you know each machine's kW through the day.
Nameplate or measured: how to get kWh per machine
Nameplate kW times running hours is the fastest estimate, but it is usually wrong. The U.S. Department of Energy notes that most electric motors are designed to run at 50% to 100% of rated load, with best efficiency near 75% [4]. A motor rarely draws its nameplate figure all shift.
Clamp meter readings
A clamp meter on each phase gives you current. That helps, but current alone misleads at light load: below about 50% load the power factor drops and current stops tracking load [4]. An idle moulder or an unloaded compressor is exactly that case.
A power meter on each machine
A three-phase power meter reads voltage, current and power factor together and works out kW as V × I × PF × √3 ÷ 1,000 [4]. Logged every few minutes, it gives kWh per machine per hour, which you can split into peak and off-peak.
Start with the biggest loads. In a plastics or metal plant that usually means injection moulders, extruders, presses, compressors, chillers and furnaces. Log whether each machine was producing at the same time, or the kWh figure cannot tell running from idle.
How idle machines waste money
Most hidden cost comes from kWh that produce no parts:
- Compressors feeding leaks. Leaks sometimes waste 20% to 30% of a compressor's output, and a plant that has not been well maintained typically leaks about 20% of its air capacity [5]. The compressor keeps loading at night and on weekends with no machine using air.
- Chillers left on after the shift. Pumps and the chiller compressor keep cooling moulds that are not running.
- Barrel and die heaters during waits. A moulder or extruder holding temperature through a material shortage or a mould change draws power and produces nothing.
- Motors running unloaded. Conveyors, hydraulic pumps and fans left on between jobs.
Regular leak checks and repairs can bring leaks below 10% of compressor output [5]. You will not know which compressor to fix first until each one is measured.
Example: one month on the medium voltage ToU tariff
The figures below are example figures, not from any client. The factory is on the Medium Voltage ToU tariff and runs 8 am to midnight on 22 weekdays, so production covers 176 peak hours and 176 off-peak hours a month. Energy charge only, at 31.32 sen peak and 27.23 sen off-peak, before AFA [1] [2].
| Load | Measured kW | Hours | kWh | Energy charge (RM) |
|---|---|---|---|---|
| Injection moulder, producing | 22 | 352 (half peak) | 7,744 | 2,267.06 |
| Same moulder, heaters on during waits | 9 | 44 (peak) | 396 | 124.03 |
| Compressor, production hours | 26 | 352 (half peak) | 9,152 | 2,679.25 |
| Compressor, nights and weekends feeding leaks | 10 | 368 (off-peak) | 3,680 | 1,002.06 |
| Chiller left on after the shift | 15 | 176 (off-peak) | 2,640 | 718.87 |
| Total | 23,612 | 6,791.27 |
Three of the five lines make no parts. Together they cost RM1,844.96 of the RM6,791.27, about 27%, before maximum demand, AFA or tax. The compressor costs more than the moulder it serves. A nameplate estimate, a 37 kW compressor at full load for 720 hours, would have put it at 26,640 kWh, more than double the 12,832 kWh measured.
Maximum demand comes on top. If staggering restarts after lunch lowers the peak half hour by 20 kW, that saves 20 × RM97.06, or RM1,941.20 a month in capacity and network charges [1].
From one-time readings to daily cost per machine
A week of clamp meter readings shows you where to look. Daily cost per machine shows you whether the fix worked: whether the night shift switched the chiller off, and whether the leak repair cut the compressor's weekend kWh.
It matters more on a large site. Under EECA 2024, an energy consumer using 21,600 GJ or more in 12 consecutive months must appoint a registered energy manager, run an energy management system, file energy efficiency reports and submit an energy audit [6]. Per-machine kWh lets that energy manager show which loads changed. Our EECA 2024 guide covers the thresholds and deadlines.
One Malaysian supplier quotes RM50,000 to RM80,000 installed for an entry-level energy monitoring system on one SME site, covering the main incomer and 5 to 10 sub-meters [7]. FactoryOS takes a per-machine route: IoTronix fits energy meters on the machines, and the Machine Energy Usage, Electrical Energy Usage and Job Costing apps show cost per machine and per job on your phone. Machine monitoring dashboards are RM500 a month with unlimited users, and connection hardware is quoted after a free site visit. For Poly-Max in Banting, IoTronix delivered a plant process dashboard with power cost per machine.
Find out which machine uses the most power
Book a free 30-minute Factory Paperwork Check: we visit your factory and show you your 3 most time-wasting processes. Ask us about per-machine energy meters while we are there.
Questions
What is an energy monitoring system?
It is a set of meters on the main incomer or on each machine. They record kW and kWh over time, so you see where and when power is used. A per-machine setup also records run and stop status. So you can separate kWh used while producing from kWh used while idle.
How much does an energy monitoring system cost in Malaysia?
One Malaysian supplier quotes RM50,000 to RM80,000 installed for an entry-level SME system. It covers the main incomer and 5 to 10 sub-meters [7]. FactoryOS machine monitoring dashboards are RM500 a month with unlimited users, and connection hardware is quoted after a free site visit.
How do I find which machine uses the most electricity?
Put a three-phase power meter on each large machine and record kW for at least a week. Then compare kWh per machine, split into peak and off-peak hours [1] [4]. Do not trust nameplate ratings. Most motors are designed to run between 50% and 100% of rated load, so they use less than the nameplate figure [4].
Can a clamp meter measure a machine's kWh?
Only roughly. A clamp meter reads current only. Below about 50% load, the power factor drops, so current no longer follows the motor's power [4]. A power meter also reads voltage and power factor, so it gives the true kW.
Can I see electricity cost per job or per square foot?
Yes, once each machine has a meter. FactoryOS has Machine Energy Usage and Job Costing apps. They show the power cost of each machine and each job. For example, a steel processor can see his electricity cost per square foot.
Sources
- [1]Suruhanjaya Tenaga (Energy Commission). Jadual Tarif Elektrik di Semenanjung Bagi Tempoh 1 Julai 2025 Hingga 31 Disember 2027
- [2]myTNB (Tenaga Nasional Berhad). Understand Your Electricity Tariff
- [3]Tenaga Nasional Berhad. Maximum Demand
- [4]U.S. Department of Energy. Determining Electric Motor Load and Efficiency (Motor Challenge fact sheet)
- [5]Compressed Air Challenge. Compressed Air Systems Fact Sheet #7: Compressed Air System Leaks, 2026
- [6]Suruhanjaya Tenaga. Energy Consumer: Energy Efficiency and Conservation Act (EECA) 2024
- [7]Trexon. EPMS Dashboard Malaysia: Real-Time Energy Monitoring